VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Michelle Holland 703-586-0487
[email protected]

NOVA-182940

Aug. 23, 2021



Loop Ramp from I-66 West to Route 28 South in Centreville Reopening to Traffic on or about Friday, August 27

FAIRFAX – The loop ramp from I-66 West to Route 28 South in Centreville will reopen on or about Friday morning, August 27. The ramp has been closed while it was reconfigured to connect with the realigned I-66 and Route 28 as part of the Transform 66 Outside the Beltway Project.

Following the reopening of the ramp, the Braddock Road/Walney Road Bridge will open to vehicles headed east from Braddock Road to Walney Road. This is anticipated to occur during the week of August 30. This new traffic movement has been unavailable due to the detour required for the I-66 West to Route 28 South ramp closure.  

The following closures are planned during the overnight hours Thursday, August 26, as part of the ramp reopening.

I-66 West at Route 28

  • Two lanes approaching Route 28 will be closed from 9 p.m. to 5 a.m.
  • All lanes will reopen by 5 a.m.

Route 28 South at I-66

  • One lane approaching I-66 will be closed from 9 p.m. to 5 a.m.
  • All lanes will reopen by 5 a.m.

Ramp from Braddock Road/Walney Road to Route 28 South

  • The ramp from Braddock Road and Walney Road to Route 28 South will be closed from 10 p.m. to 4 a.m.
  • Traffic will be directed to travel west on Braddock Road, turn right onto Westfields Boulevard East, continue east and follow signs to Route 28 South.

Ramp from I-66 West to Route 28 North

  • The ramp from westbound I-66 to Route 28 North will be closed from midnight to 4 a.m.
  • Traffic will be directed farther west to the exit to Route 29 (Lee Highway), turn left at the traffic signal onto Route 29 North, travel about one mile, then follow signs to Route 28 North.

Ramp from I-66 West to Braddock Road/Walney Road
Ramp from I-66 West to Route 28 South

  • The ramps will be closed from midnight to 4 a.m.
  • Traffic will be directed farther west to the exit to Route 29 Centreville, stay to the left and turn left at the traffic signal onto Route 29 North.
    • Drivers traveling to Braddock Road/Walney Road will continue north and follow signs to Route 28 North, stay to the left on Route 28, and follow signs to the left exit to Braddock Road/Walney Road.
    • Drivers traveling to Route 28 South will travel north and follow signs to Route 28 South.

All work is weather dependent and will be rescheduled to Friday night, August 27, (with the ramp reopening on Saturday morning, August 28) if inclement conditions occur.

Drivers should use caution and pay attention to lane markings and roadway signs when traveling in this area.

The new Route 28 and I-66 Interchange will improve traffic flow on I-66 and Route 28, and provide access to and from the future I-66 Express Lanes. The I-66 Outside the Beltway Express Lanes, which span from I-495 to Route 29 in Gainesville, are expected to open in December 2022.

Weekly updates are available at Transform66.org and on Twitter @VaDOTNOVA. To receive project updates automatically by email, sign up here.

###



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: June 14, 2023